CSX Railroad Bridge

 

  • Owner: CSX Railroad
  • Cost: $1,986,097
  • Completion Date: June 2017

 

 

Cape Romain replaced an existing CSX timber trestle in Ideal, GA. The original trestle was single track and had 40 to 50 trains per day. The new 140’ trestle is concrete filled pipe pile concrete caps and a steel-supported structure. Cape Romain contract included the installation of pile and poured in place caps, assisting CSX personnel in assembly of new spans, the actual movement of spans into final location and finally assisting CSX in site clean-up.