CSX Railroad Bridge

 

  • Owner: CSX Railroad
  • Cost: $1,986,097
  • Completion Date: June 2017

 

 

Cape Romain will replace an existing CSX timber trestle in Ideal, GA. The existing trestle is single track and has 40 to 50 trains per day.
The new 140’ trestle will be concrete filled pipe pile concrete caps and steel supported structure. Cape Romain contract includes the installation of pile and poured in place caps, assist CSX personnel in assembly of new spans, the actual movement of spans into final location and finally assisting CSX in site cleanup.
Current schedule is to mobilize late April and be ready to install spans in trestle in November of 2015.
Many delays in schedule. Span never shifted into final alignment.