Bath Pile Repair

  • Owner: NC Department of Transportation¬†
  • Construction Cost: $786,563
  • Completion Date: In Progress¬†

Scope of Services:

  • Encapsulate 153 Damaged Piles with Fiberglass Forms and Epoxy Grout
  • Jacket 35 Damaged Piles with Fiberglass Forms and 3000psi Concrete
  • Form and Pour Pier Cap Repairs on Multiple Caps

Pile repair for NCDOT: Cape Romain’s crew is made up of members of our diving division. Working from floats, boats, and barges the divers install pre-formed fiberglass forms around the piles in need of repair; they are then belted tight in many locations vertically up and down the pile; 6” of epoxy is poured into the bottom of the form where it is locked tightly to the pile. Once the epoxy has cured, either epoxy grout or class A concrete is deposited in the forms to form the protective layer around the piles. The fiberglass forms stay in place after the belts are removed for further protection of the piles.

Contact:

North Carolina Department of Transportation
Bridge Management Unit
1565 Mail Service Center
Raleigh, NC 27699-1565

 

 

Bath Pile Repair

Bath Pile Repair