• Collins and Mill Creek Bridges Replacement

  • Collins and Mill Creek Bridges Replacement

  • Collins and Mill Creek Bridges Replacement

  • Collins and Mill Creek Bridges Replacement

  • Collins and Mill Creek Bridges Replacement

  • Collins and Mill Creek Bridges Replacement

  • Collins and Mill Creek Bridges Replacement

  • Collins and Mill Creek Bridges Replacement

  • Collins and Mill Creek Bridges Replacement

  • Collins and Mill Creek Bridges Replacement

  • Collins and Mill Creek Bridges Replacement

  • Collins and Mill Creek Bridges Replacement

  • Collins and Mill Creek Bridges Replacement

  • Collins and Mill Creek Bridges Replacement

  • Collins and Mill Creek Bridges Replacement

< back to projects

Collins and Mill Creek Bridges Replacement

 

  • Owner: SCDOT / funded by Horry County
  • Cost: $2,887,000
  • Completion Date: Early 2019

Scope of Services:

  • Replaced two box culverts with two flat slab bridges to facilitate widening of SC Hwy 707

 

The project was widening SC Hwy 707 in Horry County. Cape Romain was sub contracted under AO Hardee & Son, Inc. of Little River, SC to replace two concrete box culverts with two bridges. One bridge is over Collins creek and is 120’ long. One bridge is over Mill Creek and is 90 feet long. Both bridges are phased construction. The Mill Creek Bridge site required a 60 foot long temporary bridge to bypass traffic during phase I construction.