Daniel Island Waterfront Park

 

  • Owner: Community Services Daniel Island POA
  • Cost: $ 2,358,418
  • Completion Date: November 2020

Scope of Services:

  • Installation of a Marsh Boardwalk (112’); Dock # 1 Rebuild (200’) Pier Head Office (36 X 60) (24 X 36 Covered, Pier Head (20 X 26) and 200’ Floating Docks.
  • Installation of Dock # 2 (254’) Boardwalk; (30’ X 52’ Pier Head) (24’ X 36” Covered Portion); Three sets of floating docks (332’ each) with a total 996’ of Marina.

The Daniel Island Waterfront Park is just a portion of the redevelopment of the area at the end of River Landing Drive. The upland areas are being developed with Multi-Use structures. They will be a large amenity area for events and other social gatherings. Condos with retail units below them as well as restaurants and office space. The children’s park will be revitalized as well.