Enterprise Road Bridge

  • Owner: SC Department of Transportation¬†
  • Construction Cost: $1,800,000
  • Completion Date:¬† December 2011

Scope of Services:

  • Build 180’ Flat Slab Bridge (5 Spans) x 38’ Wide with 20” Thick Deck
  • Construct 0.36 Miles of Roadway Complete with Embankment and Drainage

Enterprise Road over Mill Creek for SCDOT: This project was on an expedited schedule to minimize traffic impacts; Cape Romain mobilized two large cranes for this project, one on each end of the bridge, and constructed the new bridge from the middle out; pre-stressed 20” square composite piling support the interior bent caps; steel HP14X102 piling support the end caps; the 180’ deck slab was cast at one time to expedite the schedule; this is one of the first SCDOT bridges that use the ZBAR high performance reinforcing that is galvanized and then coated with thermal bonded polymer for an estimated 100 year lifespan; sidewalks and decorative railing walls complete the bridge package.

Contact:

South Carolina Department of Transportation
Post Office Box 1663
Conway, SC 29528

 

 

Enterprise Road

Enterprise Road