  • Owner:  The Sea Pines Company, LLC
  • Construction Cost: $483,875
  • Completion Date:  September 2011

Scope of Services:

  • Install Stone Filled Marine Mattresses
  • Place Rip Rap Stone Breakwaters
  • Backfill and Grade Shoreline

Breakwaters for The Sea Pines Company: Stone filled marine mattresses were placed on existing ground; rip rap was barged in and placed as breakwaters near the end of the beach line; once the rip rap was shaped beach sand was barged in and backfilled along design slopes and profiles to complete the project.