Park Island Bridge - Park West

  • Owner:  Park Island Development, Inc.
  • Construction Cost: $ 4,439,648.00
  • Completion Date:  June 2007

Scope of Services:

  • Construct 1500’ of Flat Slab Bridge to Park Island off the Wando River
  • Water and sewer lines were attached to the bridge
  • Closed drainage system with catch basins for environmental control of impact to wetlands
  • Install, leap frog ahead & Remove 100’ of Temporary Crane Access Trestle

The 1500lf flat slab bridge was built to access Park Island, located just off of the Wando River, in the subdivision of Park West. This access was required for the continued expansion of Park West Subdivision. Twenty-one lots were to be made available for development at a cost of approximately $ 1 million dollars per lot. 13,288 lf of 20” PS Concrete piling, 3,265 cy of class 4000 concrete, 700,000 lbs of reinforcing steel, 6,000 lf of 3” & 4” conduit and 3000 lf of concrete barrier wall with picture windows were utilized in the construction of this structure.

Contact:

Park Island Development, Inc.
2000 Center Point Road
Suite 2100
Columbia, SC 29210