• Poletti Dock Maintenance Repairs

  • Poletti Dock Maintenance Repairs

  • Poletti Dock Maintenance Repairs

  • Poletti Dock Maintenance Repairs

  • Poletti Dock Maintenance Repairs

  • Poletti Dock Maintenance Repairs

  • Poletti Dock Maintenance Repairs

  • Poletti Dock Maintenance Repairs

  • Poletti Dock Maintenance Repairs

  • Poletti Dock Maintenance Repairs

  • Poletti Dock Maintenance Repairs

  • Poletti Dock Maintenance Repairs

  • Poletti Dock Maintenance Repairs

  • Poletti Dock Maintenance Repairs

  • Poletti Dock Maintenance Repairs

  • Poletti Dock Maintenance Repairs

  • Poletti Dock Maintenance Repairs

< back to projects

Poletti Dock Maintenance Repairs

 

  • Owner:  Private-Manda Poletti
  • Construction Cost: $1,155,500
  • Completion Date: Completion Date: May 3, 2015

Scope of Services:

  • Demolition of Existing Dock
  • Pre-stress Pile Supported Bents (12” PSC Piling—94 ea.)
  • IPE Decking
  • IPE/316 SS Guardrail
  • House Removal and Return to New Foundation
  • Fixed Pier/Floating Dock/Drive On Float/Walkway

Cape Romain will be the Prime Contractor on this unusual project. Demolition of the existing 165’ X 41’ main pier and its replacement as well as the 30’ X 50’ Quartermaster House and foundation. The Quartermaster House will be raised, disconnected from its foundation and slid on beams to its resting location, until the new foundation is completed. It will then be slid back and lowered onto its new foundation. It will then be restored by others.

The new main pier will be decked with pre-grooved 5/4 IPE decking. 4X4 IPE guardrail system will encompass the entire pier area. The railings will be ½” 316 SS threaded rods on 3.5” centers. A fixed 4’ X 72 pier, gangway, 8’ X 20’ floating dock and 8’ X 20’ drive-on floating dock finishes out the New Poletti Dock.