Port Access Road North Charleston

 

  • Owner: SCDOT
  • Cost: $11,850,627
  • Completion Date: 2020

Scope of Services:

  • Two separate bridge structures: Bainbridge Connector 1041', Tidewater Road 746'
  • Temporary crane trestle
  • HP 14 X 89 Steel Piling
  • 24" PS Concrete Piling

 

The New I-26 Port Access Road improvements will provide direct traffic flow in and out of the still under-construction SCSPA Terminal along Juneau Avenue. The project will have new bridges at Stromboli Avenue Bainbridge Connector over Shipyard Critical Area and Tidewater Road over Shipyard Creek.

Cape Romain Contractors, Inc. is responsible for two of the structures with Bainbridge Connector joining Bainbridge Avenue to the new structures at Tidewater Road and the Tidewater Road off ramp down to Least Tern Lane.