Starboard Tack Bridge Replacement

 

  • Owner:  Palmetto Dunes POA
  • Construction Cost: $788,000
  • Completion Date: March 31, 2015

Scope of Services:

  • Solid Unit Slab Bridge
  • Pre-stress Pile Supported Bents (14” PSC Piling—20 ea.)
  • Replace Existing Bulkhead
  • Wood Guardrail (pedestrian/vehicular)
  • Utility Relocation
  • Existing bridge demolition

Cape Romain will be the Prime Contractor on this project. The Palmetto Dunes POA has Eleven (11) more bridges in Palmetto Dunes that will be replaced over the next 5 years, at a rate of two per year. Should Cape Romain satisfy the POA, we will then enter into negotiations for the remaining eleven bridges.