Wappoo Creek Bulkhead Maintenance

 

  • Owner:  Wappoo Creek Place HOA
  • Construction Cost: $135,250
  • Completion Date:  May 2012

Scope of Services:

  • Place Class C Rip Rap and #5 Stone to Stabilize 410 LF of Timber Bulkhead
  • Perform Structural Repairs to Existing Timber Walers, Piles, and Bulkhead

Wappoo Creek bulkhead:  CRC will add three layers of stone to the existing bulkhead to stabilize the wall after structural repairs are performed on the existing timber bulkhead.