- Owner: The River Alliance
- Cost: $236,290
- Completion Date: July 2018
Boyd Island Bridge
|
Boyd Island Bridge was a design build project for The River Alliance in Columbia, SC. The bridge crosses a branch of the Saluda River and connects a river walkway to Boyd Island, which is being developed as an extension of the public walkway. The bridge is a 105’ span steel prefabricated bridge. The foundations are raised piers on a large spread footing anchored to the existing rock substructure. |