- Owner: South Carolina State Ports Authority
- Cost: $50M
- Completion Date: April 2020
Scope of Services:
- Dredging and upload disposal of approximately 141,000 cubic yards of spoil material
- Removal and replacement of existing stone revetment
- Setting and driving approximately 581 pre-cast concrete piles with steel stingers
- Erection of pre-cast concrete pile caps and deck panels
- Cast in place concrete deck topping
- Installation of cone fenders, bollards and ship’s water service stations
- Installation of Ship to Shore container crane rails, pin sockets and tie-downs