- Owner: Mr. Rutledge Leland
- Estimated Completion Date: April 2012
Scope of Services:
- Demolition of Existing Facilities
- Design of Replacement Facilities
- Install Aluminum Floating Docks with 14” Square PSC Piles
- Construct Timber Access Pier
- Install 80’ ADA Compatible Ramp
Leland Marina: We are using an American 9299 165-Ton capacity crane on a 54’x100’ barge to demolish the existing timber structure and install the replacement facilities. Twelve aluminum floating docks will be assembled together to construct the new 441’ x 10’ floating dock. The aluminum 80’ x 6’ ramp will provide access from the new timber pier to the floating dock.
Contact:
Mr. Rutledge Leland
541 Water St
McClellanville, SC