- Owner: Wappoo Creek Place HOA
- Construction Cost: $135,250
- Completion Date: May 2012
Scope of Services:
- Place Class C Rip Rap and #5 Stone to Stabilize 410 LF of Timber Bulkhead
- Perform Structural Repairs to Existing Timber Walers, Piles, and Bulkhead
Wappoo Creek bulkhead: CRC will add three layers of stone to the existing bulkhead to stabilize the wall after structural repairs are performed on the existing timber bulkhead.
Contact:
WCPHOA
Mr. Gary Sawyer, President
47 Wappoo Creek Place
Charleston, SC 29412