Broad Creek Marina Pier Repair

A Notable Project

Project Description

The travel lift pier at Broad Creek Marina has been in disrepair for some time. The owner contracted Cape Romain Contractors to rehabilitate the pier under a maintenance and repair permit. The work consists of the installation of 76 new concrete piles, a new cast in place concrete two-way deck slab, and the removal and replacement 19 timber dolphins to protect the pier. Cape Romain’s work will be completed in conjunction with land based civil site work.

Scope of Services

  • Installation of 76 each 12” PSC Piles
  • Cast in Place Deck Slab
  • Timber Dolphin Demolition
  • Timber Dolphin Installation
  • Cast in Place Concrete Curb