Dominion Energy Transmission Line Foundation

A Notable Project

Project Description

EC Source subcontracted Cape Romain Contractors to build four pile supported foundations for new power transmission lines across the Stono River. Crews will install four (4) pile and cap reinforced concrete foundation structures and will frame and set four (4) galvanized steel power poles on the new foundations. After completion, Cape Romain will remove existing towers and foundations.

Scope of Services

  • Installation of 32 each 18” PSC Piles
  • Cast in place power pole foundations (22’x10’)
  • Anchor bolts
  • Assist in installation of galvanized steel power poles