Project Description
These bridge replacements began in the Fall of 2012, following utility relocations. The bridges are supported by driven pile and drilled shaft foundations and have large poured-in-place concrete caps, with type III prestressed girders and a poured-in-place concrete deck. Both bridges now have sidewalks on both sides with decorative galvanized railings. The bridges were constructed in their entirety on the north (upstream) side of the old bridges; traffic was shifted after completion.
Scope of Services
- Construct New 825’ x 48’ Bridge Across Folly Creek
- Construct New 1050’ x 48’ Bridge Across Folly River
- Demolition of Both Existing Bridges Originally Constructed in 1954
- Improved Drainage, Asphalt Paving, Retaining Walls, Seismic Ground Improvements, etc.
Details
Owner:
South Carolina Department of Transportation
Cost:
$32,366,740
Location:
Charleston, SC
Completion Date:
June 2015